MEMBER COMPANIES: Yukon, Yellowhead

» All Projects - Comprehensive List of YES Engineering Projects

» NorthwesTel Fibre Optic Route Design Project

Client: NorthwesTel Inc.

Category: Industrial

Summary:

In order to increase their ability to deliver internet, cable, and telecommunications services to the people of the Yukon and the Alaska Highway Corridor, NorthwesTel set in motion the construction of a 24-fibre fibre-optic line running from Fort Saint John, British Columbia to Whitehorse, Yukon and beyond.

» Swamp Point Mine Development

Client: Ascot Resources Ltd.

Category: Mining

Summary:

In the summer of 2006, Yukon Engineering Services was contracted to provide engineering services for Ascot Resources’ Swamp Point mining project. 

» Andrew Property Winter Access Road

Client: Overland Resources

Category: Mining

Summary:

The Andrew Property is currently a fly-in exploration camp that is active only during the summer months and located approximately 120 km north of Ross River.  Overland Resources needed to transport fuel and supplies to this site during winter months, in preparation for the 2008 Summer drill program.  It was decided that a temporary winter road would be the best option. 

» Wolverine Lake Mine Development

Client: Yukon Zinc Corporation

Category: Mining

Summary:

Design and construction management of access road and crew camp for Yukon Zinc’s central Yukon mine.

» Minto Copper Mine

Client: Sherwood Copper Corporation

Category: Mining

Summary:

Yukon Engineering Services involvement in the Minto property dates back to the early 1990’s.

» Whitehorse International Airport

Client: Yukon Territorial Government Transportation Engineering Branch

Category: Transportation

Summary:

Parking lot design/construction

» Whitehorse International Airport Runway Extension

Client: Yukon Territorial Government

Category: Transportation

Summary:

Yukon Engineering was contracted for engineering services for the Whitehorse Airport 13R Runway Extension.

» Mayo to Dawson Transmission Line

Client: Chant Construction

Category: Industrial

Summary:

Yukon Engineering Services Inc. and our subsidiary First Nation firm, Nan Engineering and Survey Services Inc replaced the original survey company to complete Surveying and Engineering Services. 

» C-4 Residential Subdivision

Client: Tr'ondek Hwech'in First Nation

Category: Municipal

Summary:

Subdivision design and construction management in Dawson City.

» Chilkoot Centre

Client: Argus Properties Ltd, Skookum Asphalt, Canadian Tire, Marks Work Wearhouse

Category: Municipal

Summary:

Yukon Engineering Services was contracted for the design and construction of the Chilkoot Centre lot.

» Copper Ridge Subdivision

Client: Government of Yukon

Category: Municipal

Summary:

Construction management of Copper Ridge Subdivision in Whitehorse, Yukon.

» Red Mountain Mine

Client: Tintina Mining Ltd.

Category: Mining

Summary:

Mine planning, mining and civil engineering for advanced exploration development in southern Yukon.

» North Klondike River Bridge

Client: Vicery Resources Inc.

Category: Mining

Summary:

Our mining client required an improved 25 km access to its heap leach gold mine north of the Klondike River. YES were the road design and construction engineers for the access road and haul roads network. 

Top of the page image

In Loving Memory

Rob Harvey

1955 - 2007
A man with Vision and Innovative Ideas

"Whether you agreed or disagreed with him, Rob had a way of making you think."

Designed by: Polar Hosting & TNTStudio