» NorthwesTel Fibre Optic Route Design Project
Client: NorthwesTel Inc.
Category: Industrial
Summary:In order to increase their ability to deliver internet, cable, and telecommunications services to the people of the Yukon and the Alaska Highway Corridor, NorthwesTel set in motion the construction of a 24-fibre fibre-optic line running from Fort Saint John, British Columbia to Whitehorse, Yukon and beyond.
» Swamp Point Mine Development
Client: Ascot Resources Ltd.
Category: Mining
Summary:In the summer of 2006, Yukon Engineering Services was contracted to provide engineering services for Ascot Resources’ Swamp Point mining project.
» Andrew Property Winter Access Road
Client: Overland Resources
Category: Mining
Summary:The Andrew Property is currently a fly-in exploration camp that is active only during the summer months and located approximately 120 km north of Ross River. Overland Resources needed to transport fuel and supplies to this site during winter months, in preparation for the 2008 Summer drill program. It was decided that a temporary winter road would be the best option.
» Wolverine Lake Mine Development
Client: Yukon Zinc Corporation
Category: Mining
Summary:Design and construction management of access road and crew camp for Yukon Zinc’s central Yukon mine.
» Minto Copper Mine
Client: Sherwood Copper Corporation
Category: Mining
Summary:Yukon Engineering Services involvement in the Minto property dates back to the early 1990’s.
» Whitehorse International Airport
Client: Yukon Territorial Government Transportation Engineering Branch
Category: Transportation
Summary:Parking lot design/construction
» Whitehorse International Airport Runway Extension
Client: Yukon Territorial Government
Category: Transportation
Summary:Yukon Engineering was contracted for engineering services for the Whitehorse Airport 13R Runway Extension.
» Mayo to Dawson Transmission Line
Client: Chant Construction
Category: Industrial
Summary:Yukon Engineering Services Inc. and our subsidiary First Nation firm, Nan Engineering and Survey Services Inc replaced the original survey company to complete Surveying and Engineering Services.
» C-4 Residential Subdivision
Client: Tr'ondek Hwech'in First Nation
Category: Municipal
Summary:Subdivision design and construction management in Dawson City.
» Chilkoot Centre
Client: Argus Properties Ltd, Skookum Asphalt, Canadian Tire, Marks Work Wearhouse
Category: Municipal
Summary:Yukon Engineering Services was contracted for the design and construction of the Chilkoot Centre lot.
» Copper Ridge Subdivision
Client: Government of Yukon
Category: Municipal
Summary:Construction management of Copper Ridge Subdivision in Whitehorse, Yukon.
» Red Mountain Mine
Client: Tintina Mining Ltd.
Category: Mining
Summary:Mine planning, mining and civil engineering for advanced exploration development in southern Yukon.
» North Klondike River Bridge
Client: Vicery Resources Inc.
Category: Mining
Summary:Our mining client required an improved 25 km access to its heap leach gold mine north of the Klondike River. YES were the road design and construction engineers for the access road and haul roads network.